@joco wrote:
One of my terminals had an incorrect date & time setting in Windows. The work period was started on that terminal with the incorrect setting and I was unaware of the incorrect start date until I went to close the work period. Now the reports that I try to run for that period are displaying the full range of days between the erroneous start time and the correct end time. Is there a way to go into the database and manually change the date range on the work period? If not, is there another way for me to generate daily reports that don't include the full range of dates? See picture for detail.
Posts: 6
Participants: 3